Every system we cover, and how far we take it.
Four disciplines, 36 system types, and the six stages of delivery each one is taken through. Where the stages depend on the project, the row says so rather than implying a fixed answer.
- Systems
- 36Across four disciplines
- Full scope
- 17Delivered across all six stages
- On enquiry
- 19Stages quoted against the project
Four disciplines, one accountable contract.
Most buildings end up with detection from one contractor, suppression from another and security from a third, and nobody owning the interfaces between them. Each discipline has its own page; the schedule below covers all four at once.
Scope of works.
A filled mark means Milagre delivers that stage for that system. A row reading on enquiry is one where the stages depend on the project — tell us the building and we will tell you which of the six we are taking on.
- Design
- Device layouts, hydraulic calculations, agent concentrations, cause and effect, shop drawings.
- Supply
- Equipment procured to the specified make and model, with no undeclared substitution.
- Install
- Installed to the approved drawings by our own crews, recorded against the design.
- Test
- Every device, zone and interface tested individually and documented — not sampled.
- Commission
- Cause and effect proven end to end, with the authority present where required.
- Maintain
- Scheduled inspection and testing under an annual contract, so it still works in year five.
| System | Typical application | Design | Supply | Install | Test | Commission | Maintain |
|---|---|---|---|---|---|---|---|
| Fire Alarm Systems 2 of 7 at full scope Open page → | |||||||
| Addressable fire alarm | Most commercial, hospitality and institutional buildings | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Conventional fire alarm | Small buildings, simple layouts, limited zoning needs | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Aspirating smoke detection | Data centres, clean rooms, high ceilings, cold stores | On enquiry | |||||
| Linear heat detection | Cable tunnels, conveyors, car park decks, tank farms | On enquiry | |||||
| Flame & beam detection | Warehouses, atria, hangars, process areas | On enquiry | |||||
| Voice evacuation / PA-VA | High-rise, malls, hotels, assembly occupancies | On enquiry | |||||
| Graphical monitoring & BMS integration | Campuses and multi-building estates with a central control room | On enquiry | |||||
| Fire Fighting Systems 4 of 10 at full scope Open page → | |||||||
| Wet pipe sprinkler | The default for any heated building — offices, hotels, malls, schools | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Hydrants & landing valves | Internal and external fire brigade access points | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Hose reels | First-aid firefighting by building occupants | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Fire pump sets | Any system where the incoming supply cannot meet flow and pressure | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Dry pipe sprinkler | Unheated spaces — cold stores, loading docks, exposed decks | On enquiry | |||||
| Pre-action sprinkler | Data centres and archives, where an accidental discharge is the greater risk | On enquiry | |||||
| Deluge systems | Transformer decks, tank farms, high-hazard process areas | On enquiry | |||||
| Water storage tanks | Dedicated fire reserve where the town supply is insufficient | On enquiry | |||||
| Foam systems | Flammable liquid hazards, fuel storage, aircraft hangars | On enquiry | |||||
| Water mist | Machinery spaces and heritage interiors, where water volume must be minimised | On enquiry | |||||
| Fire Suppression Systems 3 of 8 at full scope Open page → | |||||||
| FM-200 (HFC-227ea) | Server rooms, switchrooms, control rooms — small cylinder footprint | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Novec 1230 (FK-5-1-12) | The same spaces, where a low global warming potential is required | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| CO₂ — high and low pressure | Normally unoccupied enclosures: generators, paint booths, machinery | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Inert gas (IG-541, IG-55, argon) | Large volumes, and where a naturally occurring agent is preferred | On enquiry | |||||
| Kitchen hood wet chemical | Commercial cooking lines, extract hoods and ducts | On enquiry | |||||
| Foam systems | Flammable liquid storage, fuel handling, loading racks | On enquiry | |||||
| Water mist | Machinery spaces and heritage interiors, where water volume must be minimised | On enquiry | |||||
| Condensed aerosol | Small sealed enclosures and electrical cabinets | On enquiry | |||||
| Security Systems 8 of 11 at full scope Open page → | |||||||
| CCTV & video surveillance | Perimeters, entrances, production floors, public areas, car parks | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Access control | Door controllers, readers, turnstiles, credential management | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Structured cabling | Copper horizontal cabling, patching, containment and labelling | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Fibre backbone | Riser and inter-building links beyond copper distance limits | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Data networks | Switching, PoE distribution and segmentation for building systems | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Telephone systems | Extension distribution and handsets across a site | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| SMATV & TV distribution | Hotels, hospitals and residential blocks | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Parking & barrier control | Gates, barriers, ticketing and vehicle access | Design: in scope | Supply: in scope | Install: in scope | Test: in scope | Commission: in scope | Maintain: in scope |
| Intruder detection | Perimeter and internal alarm, monitored or local | On enquiry | |||||
| Intercom & video entry | Gatehouses, residential entrances, reception points | On enquiry | |||||
| Public address & background music | Non-life-safety announcement and music distribution — voice evacuation is covered under fire alarm | On enquiry | |||||
Foam systems and water mist appear under both fire fighting and fire suppression. That is not a duplicate: foam as a fighting medium and foam as a suppression agent are different applications with different design bases, and are scoped separately.
Two different problems. Two different inboxes.
A new installation and a system that has stopped working are not the same urgency, so they do not go to the same place.
Request a quote
Send the building and the systems in your specification. An engineer attends site, and you receive a scope tied to drawings rather than a lump-sum guess.
Service & maintenance
A fault, a recurring false alarm, an overdue annual test, or a system you have inherited and are not sure about.
Would rather fill in a form? Use the enquiry form